| Bulkheads, Bulkplates, Plywood Electronics Sled that Came with the Kit |
| Bulkplate. These came pre-drilled incorrectly. This picture shows my marks for drilling it correctly. |
| Dry Fitting the Components |
| Threaded Rods for the Electronics Sled |
| Custom Cut 1/8" Plywood for Electronics Sled |
| One of the pieces has been marked for notching. The notches are used to assemble with the laser cut threaded rod guides that were included. |
| Test Fitting the Electronics Sled. I had to notch one end to clear the hardware from the 1/4" eye-bolt. |
| Altimeter Mounting Hardware Installed |
| Electronics Sled |
| Bulkplate Assembly (2 Plates) being JB Welded |
| Using Weights to Press the JB Weld into the Fiberglass Bulkplate Assembly |
No comments:
Post a Comment